Project portfolio optimization as a part of strategy implementation process in small and medium-sized enterprises

Title Alternative:a methodology of the selection of projects with the aim to balance strategy, risk and performance
dc.contributor.authorVacík, Emil
dc.contributor.authorŠpaček, Miroslav
dc.contributor.authorFotr, Jiří
dc.contributor.authorKracík, Lukáš
dc.contributor.otherEkonomická fakultacs
dc.date.accessioned2018-09-10
dc.date.accessioned2018-09-13T08:33:33Z
dc.date.available2018-09-13T08:33:33Z
dc.description.abstractThis paper presents an improved managerial approach to project portfolio development using software optimization tools. A review of literature revealed a gap formed by the lack of either an established approach or a normative model of how to develop portfolios in SMEs. To bridge this gap, this paper is based on topical information and offers a method that supports decision makers in their choice of the most suitable project portfolio. This method can be implemented by the use of a simulation software tool for project portfolio optimization while considering constraints and conformity with corporate strategy. The authors conclude that the foundation of success is to formulate optimum portfolios, the configurations of which reflect all key strategic parameters. Moreover, it must be feasible to implement such a portfolio in the environment of SMEs within disposable firm resources and consider identifiable risks upon the selection of the effective project portfolio. One chosen case study evidenced the viability of this approach. The approach to project portfolio optimization discussed in this paper shows the effectiveness of the selected methodology for project portfolio optimization that in turn significantly contributes to meeting strategic goals and thus an increase in company performance and shareholders’ value. The use of a common software tool together with the right access to data collection and processing allows managers to make better decisions for the effective future allocation of resources over the chosen project portfolio.en
dc.formattext
dc.format.extent17 strancs
dc.identifier.doi10.15240/tul/001/2018-3-007
dc.identifier.eissn2336-5604
dc.identifier.issn1212-3609
dc.identifier.urihttps://dspace.tul.cz/handle/15240/26632
dc.language.isoen
dc.publisherTechnická Univerzita v Libercics
dc.publisherTechnical university of Liberec, Czech Republicen
dc.publisher.abbreviationTUL
dc.relation.ispartofAaltonen, P. (2010). Co-selection in R&D Project Portfolio Management: Theory and Evidence (Doctoral Dissertation Series 2010/6). Helsinki University of Technology, Department of Industrial Engineering and Management, Espoo, Finland.cs
dc.relation.ispartofAas, T. H., Breunig, K. J. & Hydle, K. M. (2017). Exploring New Service Portfolio Management, International Journal of Innovation Management, 21(7), 1-31. https://doi.org/10.1142/S136391961750044X.cs
dc.relation.ispartofArcher, N., & Ghasemzadeh, F. (1999). An integrated framework for portfolio selection, International Journal of Project Management. 17(4). https://doi.org/10.1016/S0263-7863(98)00032-5.cs
dc.relation.ispartofAritua, B., Smith, N. J., & Bower, D. A. (2009). Construction client multi-projects – A complex adaptive systems perspective. International Journal of Project Management, 27(1), 72-79. https://doi.org/10.1016/j.ijproman.2008.02.005.cs
dc.relation.ispartofBrester, C., Ryzhikov, I., & Semenkin, E. (2017). Multi-objective Optimization Algorithms with the Island Metaheuristic for Effective Project Management Problem Solving. Organizacija, 50(4), 364-373. https://doi.org/10.1515/orga-2017-0027.cs
dc.relation.ispartofChristiansen, J. K., & Varnes, C. (2008). From models to practice: decision making at portfolio meetings. International Journal of Quality and Reliability Management, 25(1), 87-101. https://doi.org/10.1108/02656710810843603.cs
dc.relation.ispartofColdrick, S., Longhurst, P., Ivey, P., & Hannis, J. (2005). An R&D options selection model for investment decisions, Technovation, 25, 185-193. https://doi.org/10.1016/S0166-4972(03)00099-3.cs
dc.relation.ispartofCooper, R., Edgett, S., & Kleinschmidt, E. (2001). Portfolio Management for New Products (2nd ed.). Cambridge, MA: Perseus Press.cs
dc.relation.ispartofCooper, R., Edgett, S., & Kleinschmidt, E. (2002). Optimizing the state-gate process: what best-practice companies do-II. Research Technology Management, 45(6), 43-49. https://doi.org/10.1080/08956308.2002.11671532.cs
dc.relation.ispartofCooper, R., & Edgett, S. (2003). Overcoming the crunch in resources for new product development. Research Technology Management, 46(3), 48-58. https://doi.org/10.1080/08956308.2003.11671566.cs
dc.relation.ispartofCooper, R., Edgett, S., & Kleinschmidt, E. (2004). Benchmarking best NPD practices – II. Research Technology Management, 47(3), 50-59. https://doi.org/10.1080/08956308.2004.11671630.cs
dc.relation.ispartofCreswell, J. W. (2007). Qualitative Inquiry and Research Design: Choosing among Five Approaches (2nd ed.). Thousand Oaks, CA: Sage.cs
dc.relation.ispartofDawidson, O. (2004). Expectations to be fulfilled by R&D project portfolio management. In Proceedings of the EIASM Product development Management Conference (pp. 331-346). Dublin.cs
dc.relation.ispartofDe Reyk, B., Grushka-Cockayne, Y., Lockett M., Calderini, S.R., Moura, M., & Sloper, A. (2005). The impact of project portfolio management on information technology projects. International Journal of Project Management, 23(7), 524-537. https://doi.org/10.1016/j.ijproman.2005.02.003.cs
dc.relation.ispartofEngwall, M., & Jerbrant, A. (2003). The resource allocation syndrome: the prime challenge of multi project management? International Journal of Project Management, 21, 403-409. https://doi.org/10.1016/S0263-7863(02)00113-8.cs
dc.relation.ispartofERNST & YOUNG. (2013). Průzkum řízení projektů v ČR a SR 2013.cs
dc.relation.ispartofEIRMA, European Industrial Research Management Institute. (1995). Evaluation of R&D Projects [Working group reports, Report No. 47]. Paris: ERIMA.cs
dc.relation.ispartofFahrni, P., & Späting, M. (1990). An application oriented guide to R&D project selection and evaluation methods. R&D Management, 20(2), 155-171. https://doi.org/10.1111/j.1467-9310.1990.tb00693.x.cs
dc.relation.ispartofFotr, J., & Hnilica, J. (2014). Aplikovaná analýza rizika ve finančním managementu a investičním rozhodování (2nd ed.). Praha: Grada Publishing.cs
dc.relation.ispartofFotr, J., & Souček, I. (2015). Tvorba a řízení portfolia projektů. Praha: Grada Publishing.cs
dc.relation.ispartofFotr, J., Švecová, L., Hrůzová, H., & Richter, J. (2010). Manažerské rozhodování. Postupy, metody a nástroje. Praha: Ekopress.cs
dc.relation.ispartofFotr, J., Vacík, E., Špaček, M., & Souček, I. (2015). Scenarios, their concept, elaboration and application. Baltic Journal of Management, 10(1), 73-97. https://doi.org/10.1108/BJM-01-2014-0004.cs
dc.relation.ispartofGassmann, O., & Reepmeyer, G. (2005). Organizing Pharmaceutical Innovation: From Science Based Knowledge Creators to Drug Oriented Knowledge Brokers. Creativity and Innovation Management, 14(3), 233-246. https://doi.org/10.1111/j.1467-8691.2005.00344.x.cs
dc.relation.ispartofGhasemzadeh, F., & Archer, N. (2000). Project selection through decision support, Decision Support System, 29(1), 73-78. https://doi.org/10.1016/S0167-9236(00)00065-8.cs
dc.relation.ispartofHauser, J. R., & Zettelmeyer, F. (1997). Metrics to evaluate R,D&E. Research Technology Management, 40(4), 32-38. https://doi.org/10.1080/08956308.1997.11671140.cs
dc.relation.ispartofIPMA®, International Project Management Association. (2015). Individual Competence Baseline for Project, Programme and Portfolio Management. Version 4.0. Nijkerk, The Netherlands.cs
dc.relation.ispartofJoubert, F. J., & Pretorius, L. (2017). Using Monte Carlo Simulation to Create a Ranked Check List of Risks in a Portfolio of Railway Construction Projects. South African Journal of Industrial Engineering, 28(2), 133-148. https://dx.doi.org/10.7166/28-2-1604.cs
dc.relation.ispartofKillen, C. P., Hunt, R. A., & Kleinschmidt, E. J. (2008). Project portfolio management for product innovation. International Journal of Quality & Reliability Management, 25(1), 25-38. https://doi.org/10.1108/02656710810843559.cs
dc.relation.ispartofKock, A., & Gemünden, H. G. (2016). Antecedents to Decision-Making Quality and Agility in Innovation Portfolio Management. Journal of Product Innovation Management, 33(6), 670-686. https://doi.org/10.1111/jpim.12336.cs
dc.relation.ispartofKorotin, V., Popov, V., Tolokonsky, A., Islamov, R., & Ulchenkov, A. (2017). A multi-criteria approach to selecting an optimal portfolio of refinery upgrade projects under margin and tax regime uncertainty. Omega, 72, 50-58. https://doi.org/10.1016/j.omega.2016.11.003.cs
dc.relation.ispartofKunz, C. (2007). Strategisches Multiprojektmanagement (2nd ed.). Wiesbaden: Deutscher Universitäts-Verlag.cs
dc.relation.ispartofLawson, C. P., Longhurst, P. J., & Ivey, P. C. (2006). The application of a new research and development project selection model in SMEs. Technovation, 26(2), 242-250. https://doi.org/10.1016/j.technovation.2004.07.017.cs
dc.relation.ispartofLiu, Y., & Liu, Y. K. (2017). Distributionally robust fuzzy project portfolio optimization problem with interactive returns. Applied Soft Computing, 56, 655-668. https://doi.org/10.1016/j.asoc.2016.09.022.cs
dc.relation.ispartofLomnitz, G. (2004). Multiprojektmanagement. Projekte erfolgreich planen, vernetzen und steuern (2nd ed.). Frankfurt: Redline Wirtschaft.cs
dc.relation.ispartofLukesch, C. J. (2000). Umfassendes Projektportfoliomanagement in Dienstleistungskonzernen am Beispiel eines grossen, international operierenden Versicherungsunternehmens. (Doctoral Dissertation No. 13710). Zürich: ETH.cs
dc.relation.ispartofMartinsuo, M., & Lehtonen, P. (2007). Role of single-project management in achieving portfolio management efficiency. International Journal of Project Management, 25(1), 56-65. https://doi.org/10.1016/j.ijproman.2006.04.002.cs
dc.relation.ispartofMartinsuo, M. (2013). Project portfolio management in practice and in context. International Journal of Project Management, 31, 794-803. https://doi.org/10.1016/j.ijproman.2012.10.013.cs
dc.relation.ispartofMathews, S. (2009). Valuing risky projects with real options. Research-Technology Management, 52(5), 32-41. https://doi.org/10.1080/08956308.2009.11657587.cs
dc.relation.ispartofMiguel, P. A. C. (2006). Technology Management for the Global Future. PICMET, 6, 2724-2731.cs
dc.relation.ispartofMohagheghi, V., Mousavi, S. M., & Vahdani, B. (2015). A New Optimization Model for Project Portfolio Selection under Interval-Valued Fuzzy Environment. Arabian Journal for Science and Engineering, 40(11), 3351-3361. https://doi.org/10.1007/s13369-015-1779-6.cs
dc.relation.ispartofMohagheghi, V., Mousavi, S. M., Vahdani, B., & Shahriari, M. R. (2017). R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach. Neural Computing & Applications, 28(12), 3869-3888. https://doi.org/10.1007/s00521-016-2262-3.cs
dc.relation.ispartofPérez, O. R., Watts, D., & Flores, Y. (2018). Planning in a changing environment: Applications of portfolio optimisation to deal with risk in the electricity sector. Renewable & Sustainable Energy Reviews, 82(3), 3808-3823. https://doi.org/10.1016/j.rser.2017.10.089.cs
dc.relation.ispartofPoh, K. L., Ang, B. W., & Bai, F. (2001). A comparative analysis of R&D project evaluation methods. R&D Management, 31(1), 63-75. https://doi.org/10.1111/1467-9310.00197.cs
dc.relation.ispartofPMBOK, Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (5th ed.).cs
dc.relation.ispartofPRINCE2. (2017). Managing Successful Projects with PRINCE2® (1st ed.). Second Impression, AXELOS.cs
dc.relation.ispartofQiang, M. (2017). Research on the Construction of Energy Project Portfolio Management Process System. Agro Food Industry Hi-Tech, 28(3), 249-253.cs
dc.relation.ispartofRinguest, J., Graves S., & Case, R. H. (1999). Formulating R&D portfolios that accounts for risk, Research Technology Management, 42(6), 40-43. https://doi.org/10.1080/08956308.1999.11671317.cs
dc.relation.ispartofSanwal, A. (2007). Optimizing Corporate Portfolio Management: Aligning Investment Proposals with Organizational Strategy. Hoboken: John Wiley & Sons.cs
dc.relation.ispartofSeidl, J. (2011). Multiprojektmanagement. Heidelberg: Springler.cs
dc.relation.ispartofShah, R., & Jammalamadaka, P. R. (2017). Optimal Portfolio Strategy for Risk Management in Toll Road Forecasts and Investments. Transportation Research Record: Journal of the Transportation Research Board, 2670, 83-94. https://doi.org/10.3141/2670-11.cs
dc.relation.ispartofSpradlin, C., & Kutoloski, D. (1999). Action-oriented portfolio management. Research Technology Management, 42(2), 26-32. https://doi.org/10.1080/08956308.1999.11671270.cs
dc.relation.ispartofSteinle, C., Eßeling, V., & Mach, K. (2010). Entwicklung einer Konzeption zur Priorisierung und Selektion von Projekten im Rahmen des Projektportfolio-Managements. In C. Steinle, V. Eßeling, & T. Eichenberg (Eds.), Handbuch Multiprojektmanagement. Projekte Erfolgreich strukturieren und steuern (2nd ed.) (pp. 159-172). Berlin: Erich Schmidt Verlag.cs
dc.relation.ispartofVacík, E., & Kracík, L. (2015). Multiprojektování a priorizace projektů v inovativních podnicích. Ekonomický časopis, 63(1), 72-94.cs
dc.relation.ispartofVerbano, C., & Nosella, A. (2010). Addressing R&D investment decisions: a cross analysis of R&D project selection methods. European Journal of Innovation Management, 13(3), 355-379. https://doi.org/10.1108/14601061011060166.cs
dc.relation.ispartofWideman, R. M. (2005). Foreword. In H. A. Levine (Ed.), Project portfolio management: a practical guide to selecting projects, managing portfolios, and maximizing benefits. San Francisco, CA: John Wiley and Sons, Inc.cs
dc.relation.ispartofWu, W., Dandy, G. C., Maier, H. R., Maheepala, S., Marchi, A., & Mirza, F. (2017). Identification of Optimal Water Supply Portfolios for a Major City. Journal of Water Resources Planning and Management, 143(9).cs
dc.relation.ispartofXu, W., Liu, G., Li, H., & Luo, W. (2017). A Study on Project Portfolio Models with Skewness Risk and Staffing. International Journal of Fuzzy Systems, 19(6), 2033-2047. https://doi.org/10.1007/s40815-017-0295-0.cs
dc.relation.ispartofYong-Hong, S., Jian, M., Zhi-Ping, F., & Jun, W. (2008). A group decision support approach to evaluate experts for R&D project selection. IEEE Transactions on Engineering Management, 56(1), 158-170. https://doi.org/10.1109/TEM.2007.912934.cs
dc.relation.ispartofEconomics and Managementen
dc.relation.isrefereedtrue
dc.rightsCC BY-NC
dc.subjectstrategyen
dc.subjectproject portfolio managementen
dc.subjectprojecten
dc.subjectprogrammeen
dc.subjectportfolio optimizationen
dc.subjectefficient frontieren
dc.subjectSMEen
dc.subject.classificationO21
dc.subject.classificationO22
dc.subject.classificationO32
dc.titleProject portfolio optimization as a part of strategy implementation process in small and medium-sized enterprisesen
dc.title.alternativea methodology of the selection of projects with the aim to balance strategy, risk and performanceen
dc.typeArticleen
local.accessopen
local.citation.epage123
local.citation.spage107
local.facultyFaculty of Economics
local.filenameEM_3_2018_07
local.fulltextyes
local.relation.abbreviationE+Mcs
local.relation.abbreviationE&Men
local.relation.issue3
local.relation.volume21
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
EM_3_2018_07.pdf
Size:
1.36 MB
Format:
Adobe Portable Document Format
Description:
Článek
Collections