Rok 2024 (ročník 27)
Permanent URI for this community
Browse
Browsing Rok 2024 (ročník 27) by Subject "C63"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
- ItemAn attempt to resolve no-wait flow shop scheduling problems using hybrid ant colony and whale optimization algorithms(Technická Univerzita v Liberci, ) Rostamzadeh, Reza; Gholipour, Arezou; Komari Alaei, Mohammad Reza; Zavadskas, Edmundas Kazimieras; Saparauskas, Jonas; Ekonomická fakultaThe incentive for many developments and scientific progresses within the field of scheduling has emerged from industrial environments, and naturally, it could be utilized in expressing the scheduling concepts regarding terms used in the industry. Generally speaking, scheduling problems are known as limited optimization issues through which decisions related to the machines’ assignment and works processing sequence are probed. Thus, following a review of the related literature, the major goal of this research is to design a mathematical model and to solve it through a meta-heuristic for no-wait flow shop scheduling problem using different machines for the purpose of minimizing the time required to complete the work using whale and ant colony optimization (ACO) algorithms in Sanat-Gostar-e-Hamgam Shoe Company. The ACO and whale algorithm methods are used to compare and predict scheduling activities in manufacturing line of shoe industry. The results showed an ACO algorithm with two stages in mean ideal distance (MID) end amounting to 76.65 and 77.38, respectively. Also, regarding the amounts of standard error mean squares, it could be claimed that the model designed using the improved whale algorithm has a better prediction, and the minimum time required to complete works using the whale algorithm is estimated to be equal to 86.1071. This could lead to an optimal state in achieving the predetermined goals.
- ItemUtilization of time-driven activity-based costing and process simulation in cost management of organization(Technická Univerzita v Liberci, ) Halaska, Michal; Sperka, Roman; Ekonomická fakultaThe deployment of information and communication technologies in organizations is on the rise. Many organizations consider the application of technologies to be a crucial key to improve their processes. However, traditional costing systems are not suitable for cost estimation of business processes due to the use of volume-based cost drivers, which are often not adequate for the structure of today’s organizations. In this research, we present an overview of how the TDABC (time-driven activity-based costing) model can be combined with process mining and business process simulation for cost estimation of such processes. The objective of this paper is to use the cost dimension as a major attribute for the potential implementation of robotic process automation (RPA) in companies. However, information and communication technologies could be considered in general. We demonstrate our approach in a case study that takes advantage of a real-life event log containing transactional data representing the loan application process in an insurance company. The event log is analyzed and processed using process mining techniques. Based on the preprocessing, a simulation model representing the original loan application process is designed. The designed simulation model is then used for simulation of partial and full implementation of RPA through separate scenarios. Then, we add the cost dimension to the simulation by enriching the event log with cost data based on a formalized cost model. We show that even though partial implementation of RPA might not deliver significant increase in efficiency in the process, it might still represent significant cost savings.