Snížení časů při přetypování stroje Sacma SP 28 A ve firmě Kamax s.r.o.

Title Alternative:The time reduction during machine Sacma SP 28 A change over in Kamax company Ltd.
Loading...
Thumbnail Image
Date
2012
Journal Title
Journal ISSN
Volume Title
Publisher
Technická Univerzita v Liberci
Abstract
This bachelor thesis deals with the method SMED of machine Sacma SP 28 A in Kamax company Ltd. in Turnov, thereby tries to achieve time reduction by the machine change over. The first part of thesis describes Kamax company Ltd. Then follow the soft method SMED introduction and continues with machine Sacma SP 28 A characteristic. The next part analyse the resent conditions of the change over and shows the analysis of individual operation. At the end is introduced the improvement suggestion how reduce time change over, including total evaluation and evaluation of individual suggestion.
Tato bakalářské práce se zabývá aplikací metody SMED na strojní zařízení Sacma SP 28 A ve firmě Kamax s.r.o. Turnov, čímž se snaží dosáhnout zkrácení času přestaveb. První část práce je zaměřena na charakteristiku společnosti Kamax. Poté je představena samotná metoda SMED a následně přiblíží čtenáři stroj Sacma SP 28 A. Další část práce tvoří analýza současného stavu přetypování a rozborem jednotlivých operací. V poslední části je potom představen návrh zlepšení na zkrácení časů přestaveb, včetně celkového zhodnocení i zhodnocení jednotlivých návrhů.
Description
katedra: KOM; přílohy: 1 tabulka + Ganttův diagram; rozsah: 78
Subject(s)
smed, time of change over, internal action, external action, machine sacma sp 28 a, smed, čas přestavby, interní činnost, externí činnost, stroj sacma sp 28 a
Citation
ISSN
ISBN
Collections