Racionalizace výrobního procesu pro servopumpy v závodě TRW Automotive Czech s.r.o. ve Frýdlantu
Title Alternative:RATIONALISATION OF THE PRODUCTION PROCESS OF VALE PUMPS IN TRW AUTOMOTIVE CZECH S.R.O. IN FRYDLANT
dc.contributor.advisor | Lubina, Jiří | |
dc.contributor.author | Zajíček, Petr | |
dc.date | 2012 | |
dc.date.accessioned | 2015-07-08 | |
dc.date.available | 2015-07-08 | |
dc.date.committed | 2012-05-25 | |
dc.date.defense | 2012-06-13 | |
dc.date.issued | 2012-01-01 | |
dc.date.submitted | 2012-03-16 | |
dc.degree.level | bc | |
dc.description | katedra: KOM; přílohy: CD; rozsah: 50 s. | cs |
dc.description.abstract | Dissertation investigates the implementation of lean production tools such as 5S, SMED or visual management in order to achieve more efficient operation of the vale pump production process in TRW Automotive Czech s.r.o. Frýdlant. TRW is primarily interested in visual management options and would like to use the conclusions from this piece of work in areas other than in pumps assembly. | en |
dc.description.abstract | Bakalářská práce se zabývá nástroji štíhlé výroby jako je 5S, SMED či vizualizace řízení. Hlavním cílem je za pomoci těchto nástrojů zajistit efektivnější chod případové studie montáže pump ve firmě TRW Automotive Czech s.r.o. Frýdlant. Tato firma se zajímá především o možnosti vizuálního řízení a závěry plynoucí z této práce by chtěla využít i na jiných pracovištích, než je montáž pump. | cs |
dc.format | text | |
dc.identifier.uri | https://dspace.tul.cz/handle/15240/12831 | |
dc.language.iso | cs | |
dc.publisher | Technická Univerzita v Liberci | cs |
dc.subject | lean manufacturing | en |
dc.subject | visualization | en |
dc.subject | 5s | en |
dc.subject | smed | en |
dc.subject | štíhlá výroba | cs |
dc.subject | vizualizace | cs |
dc.subject | 5s | cs |
dc.subject | smed | cs |
dc.subject.verbis | vizualizace (počítačová grafika) | cs |
dc.title | Racionalizace výrobního procesu pro servopumpy v závodě TRW Automotive Czech s.r.o. ve Frýdlantu | cs |
dc.title.alternative | RATIONALISATION OF THE PRODUCTION PROCESS OF VALE PUMPS IN TRW AUTOMOTIVE CZECH S.R.O. IN FRYDLANT | en |
dc.type | Thesis | |
local.department | KOM | cs |
local.faculty | Fakulta strojní | cs |
local.identifier.stag | 25000 | |
local.identifier.verbis | 463869 | |
local.note.administrators | oprava_A | |
local.verbis.aktualizace | 2019-10-05 06:13:29 | cs |
local.verbis.studijniprogram | KOM Strojírenství/Výrobní systémy | cs |
Files
Original bundle
1 - 4 of 4
Loading...
- Name:
- bc_25000.pdf
- Size:
- 14.13 MB
- Format:
- Adobe Portable Document Format
- Description:
- kvalifikační práce
Loading...
- Name:
- opo_25000.pdf
- Size:
- 1.16 MB
- Format:
- Adobe Portable Document Format
- Description:
- posudek oponenta
Loading...
- Name:
- ved_25000.pdf
- Size:
- 470.46 KB
- Format:
- Adobe Portable Document Format
- Description:
- posudek vedoucího
Loading...
- Name:
- obh_25000.pdf
- Size:
- 558.19 KB
- Format:
- Adobe Portable Document Format
- Description:
- výsledek obhajoby